Then a piece of 1/4 inch floor underlayment.
83 Fleet Rebuild on a 2010 Tundra
Started by
Sleddog
, Nov 21 2019 05:47 AM
55 replies to this topic
#21
Posted 22 November 2019 - 07:34 PM
#25
Posted 26 November 2019 - 09:44 PM
To finish up the outside of the wider floor pack, I used a 2x6 on each side to firm up the base and used three pieces of 2x2 per side to frame up from there. I covered the framing with metal from a roll of metal roof flashing I already had. I forgot to take photos of the framing before covering it with metal.
0 user(s) are reading this topic
0 members, 0 guests, 0 anonymous users