My wife and I are going to pull the trigger on a new FWC Hawk. We've been going through the option list over and over again trying to figure out what we want vs cost vs getting it at a later date.
Are there any options that really need/should be done when the camper is originally built vs adding the option later on?
For example, is it better to do things like the solar plug or rear wall steps now due to the difficulty with adding them later?
If anyone has insight or even a list of the items that we should really consider getting done at the factory during the construction I'd really appreciate it.
Also, if anyone knows of any other cool additions/changes the factory can do (that aren't normally advertised) during the build I'd love to know about them too.
Thanks
Dwayne
Are there any options that really need/should be done when the camper is originally built vs adding the option later on?
For example, is it better to do things like the solar plug or rear wall steps now due to the difficulty with adding them later?
If anyone has insight or even a list of the items that we should really consider getting done at the factory during the construction I'd really appreciate it.
Also, if anyone knows of any other cool additions/changes the factory can do (that aren't normally advertised) during the build I'd love to know about them too.
Thanks
Dwayne